Modular buildings
MODUNERA · Additional solutions

Modular buildings

Expandable modules for residential, hospitality, office and commercial use, engineered for the project and manufactured for transport.

Positioning

A module is a room built complete in the shop and set in one piece. Almost everything about it is decided by what may travel by road: width, height and weight are design parameters, not afterthoughts.

Capability

What we build under Modular buildings.

Tiny houses remain the core business. This capability extends it where a project needs more floor area, a different structural system or a delivery of its own.

  • Residential and guest modules
  • Hotel rooms, reception and sanitary blocks
  • Office, retail and workshop units
  • Extensions to existing buildings
Feasibility

What actually decides it.

These four points decide most projects in this field. Settled early they cost nothing; settled late they cost the schedule.

01

The transport envelope, not the factory

What limits a module is the road. What may travel without a special-transport permit sets its width and height; anything larger is buildable but changes the route, the permits, the escort and the cost. This belongs at the start of the design, not at the end.

02

The joint between two modules

Two modules side by side are not two buildings. Sound, fire and moisture all meet at the shared edge, and that junction is the most demanding part of a multi-module building. It is engineered before the modules are built.

03

Crane and foundation

A module is delivered, not erected on site. The crane has to reach the final position and the foundation has to be finished and dimensionally correct before it arrives. Access, standing area and ground conditions are part of feasibility.

04

Planning law still applies

A module that stays is a building. Prefabricated does not mean permit-free. Zoning, use and duration are decided by the competent authority at the site, not by the method of construction.

Scope

What is included, and what is not.

The second column is the important one. Foundation, connections and permits are the items a quotation does not contain and a project needs anyway.

In scope

  • Structure, envelope and interior fit-out
  • Building services up to the connection point
  • Factory inspection and documentation

Not included

  • Foundation and ground works
  • Crane, site assembly and joining of multiple modules unless contracted
  • Connection to water, wastewater and power
  • Permits in the destination country
FAQ

Questions that come before the quotation.

The limit is transport, not production. What may travel without a special-transport permit sets the width and height. Larger is often buildable, but route, permits and cost change with it — which is why the question is settled before the design, not after.

Yes, if the extension is planned from the start. The connecting edge, the service routing and the foundation have to be prepared for it. Adding a module afterwards is possible but costs more than allowing for it at the outset.

If it stays, yes. Prefabrication changes nothing about that. The competent authority is local; the country pages name it for each market, along with the plan that governs the site.

A tiny house sits on a chassis and stays movable; a module sits on a foundation and is set once. Nearly every other difference follows from that — approval, permit route, foundation, transport.

It depends on quantity, specification level and how quickly approvals come back. A date is committed after specification sign-off and not before, because any earlier figure would be a guess.

Five destination markets

What has to be settled in each country.

The same question is answered differently in Copenhagen than in Zurich. These five points belong in every project check, whatever detail you are researching right now.

Germany

Responsible: the lower building authority of the district or independent city.

Governing plan: the Bebauungsplan, or an assessment under §34 or §35 BauGB where there is none.

Permanent living is possible where the plot lies within a built-up area or a Bebauungsplan permits residential use and the project is approved. In the outer area under §35 BauGB, living is privileged only in narrowly defined cases — the most common reason German projects fail.

Germany →

Netherlands

Responsible: the municipality, through the Omgevingsloket.

Governing plan: the municipal omgevingsplan under the Environment and Planning Act.

Permanent living requires a residential function in the omgevingsplan. Many attractive sites are designated for recreation, where permanent residence is not allowed — even where it happens in practice.

Netherlands →

Denmark

Responsible: the kommune.

Governing plan: the lokalplan together with the zone status (byzone, sommerhusområde or landzone).

Permanent living requires a site in byzone or an equivalent designation. In sommerhusområder year-round residence is restricted in principle, and exceptions are tied to personal conditions.

Denmark →

Luxembourg

Responsible: the commune.

Governing plan: the plan d'aménagement général (PAG) and the associated plan d'aménagement particulier (PAP).

Permanent living is possible where the PAG zone permits residential use and the autorisation de construire is granted. Because municipalities are small, practice differs noticeably from place to place.

Luxembourg →

Switzerland

Responsible: the municipality together with the canton.

Governing plan: the municipal land-use plan and the zoning ordinance.

Permanent living is possible inside the building zone where the zone permits residential use and the Baubewilligung is granted. Outside the building zone, living is admissible only in narrowly defined exceptions — the most common reason Swiss projects fail.

Switzerland →
Models

Which models come into question.

Eight plans on one technical basis, 2.55 metres wide. What differs is length, layout and specification depth.

ModelLayoutLengthEx works
MD 1Panorama and loft8.00 m or 9.70 m44,900 €
MD 2Two lofts for families9.00 m52,900 €
MD 3Loft plus extra room8.00 m or 9.70 m47,900 €
MD 4Loft, room and veranda8.00 m or 9.00 m50,900 €
MD 5Compact with extra room8.00 m or 9.00 m46,900 €
MD 6Chalet with pitched roof8.00 m or 9.00 m54,900 €
MD 7Entry model8.00 m42,900 €
MD 8Compact, upgraded line8.00 m45,900 €
Checklist

Five points before ordering.

  • A written answer from the responsible authority on admissibility at the specific plot — verbal assurances do not carry a project.
  • Access and unloading point, with photographs and dimensions. In practice the last hundred metres cause more trouble than the long haul.
  • Servicing: the distance to power, drinking water and sewer. That distance sets one of the largest secondary items.
  • Type of use and number of people. Permanent living, holidays and letting lead to different specifications of the same model.
  • Budget range including foundation, connections, unloading, planning, fees and insurance — not just the ex-works price.

Start your project in two minutes.

Send your country, intended use and preferred model via WhatsApp and we will structure the next step.

WhatsApp enquiry →