Technology and construction

How a tiny house is built, and which decisions you cannot revisit later.

Almost everything inside a tiny house can be changed after handover. The structure, the build-up and the position of the services cannot. Those are the decisions worth spending time on before production starts.

In short

Almost everything inside a tiny house can be changed after handover. The structure, the build-up and the position of the services cannot. Those are the decisions worth spending time on before production starts.

Steel frame, and why it matters for a building that travels

MODUNERA units are built on a load-bearing steel superstructure with a steel chassis, rather than a timber stud frame. The reason is not strength in the abstract — it is that this building gets loaded onto a low-loader and driven across a continent. Racking loads during transport are different from the loads a static house sees, and galvanising protects the frame where nobody will ever reach it again. The axle and brake components are specified around a 3,500 kg concept.

The build-up follows the destination, not the catalogue

Insulation thickness, glazed area, ventilation and heating are one decision, not four. A build-up specified for a summer unit on Lake Constance is too thin for permanent living in Jutland, and glazing that is a joy in Zurich in February is a problem in Ticino in July. We specify by heating season, snow load zone and wind zone at the actual address — which is why the site has to be known before production, not after.

Ventilation is the point most projects underestimate

In a compact volume, moisture that would go unnoticed in a large house shows up within one heating season. Mechanical ventilation with heat recovery is the most effective control; without it, the moisture content of the structure depends on how disciplined the occupants are about opening windows in February. For a permanently occupied unit in Denmark or an alpine site, we treat it as the rule rather than an option.

Services: short runs, one wall

Where the kitchen and bathroom sit relative to each other decides the length of every pipe and cable in the house. Putting them on a single service wall — the approach MD 5 is built around — shortens the runs, reduces the number of penetrations through the insulated envelope, and saves floor area at the same time. It is an unglamorous decision that pays for itself three times over.

Guides

Detailed guides in this area.

Year-round living and climateRead more
Questions

Frequently asked, answered here.

Because the building is transported. Steel handles the racking loads of road transport better, and corrosion protection specified per order protects the structure in places that become permanently inaccessible once the build-up is closed.

All eight models share a 2.55 metre base width, which keeps road transport in Europe within normal dimensions. Lengths run from 8.00 to 9.70 metres depending on the model.

No. It is specified for the heating season, snow load zone and wind zone at the actual site. That is why we ask for the address before production rather than after.

For permanent occupation, and for any unit in Denmark or at altitude, we treat heat-recovery ventilation as standard. In a compact volume it is the most effective protection the structure has against moisture.

Five destination markets

What has to be settled in each country.

The same question is answered differently in Copenhagen than in Zurich. These five points belong in every project check, whatever detail you are researching right now.

Germany

Responsible: the lower building authority of the district or independent city.

Governing plan: the Bebauungsplan, or an assessment under §34 or §35 BauGB where there is none.

Permanent living is possible where the plot lies within a built-up area or a Bebauungsplan permits residential use and the project is approved. In the outer area under §35 BauGB, living is privileged only in narrowly defined cases — the most common reason German projects fail.

Germany →

Netherlands

Responsible: the municipality, through the Omgevingsloket.

Governing plan: the municipal omgevingsplan under the Environment and Planning Act.

Permanent living requires a residential function in the omgevingsplan. Many attractive sites are designated for recreation, where permanent residence is not allowed — even where it happens in practice.

Netherlands →

Denmark

Responsible: the kommune.

Governing plan: the lokalplan together with the zone status (byzone, sommerhusområde or landzone).

Permanent living requires a site in byzone or an equivalent designation. In sommerhusområder year-round residence is restricted in principle, and exceptions are tied to personal conditions.

Denmark →

Luxembourg

Responsible: the commune.

Governing plan: the plan d'aménagement général (PAG) and the associated plan d'aménagement particulier (PAP).

Permanent living is possible where the PAG zone permits residential use and the autorisation de construire is granted. Because municipalities are small, practice differs noticeably from place to place.

Luxembourg →

Switzerland

Responsible: the municipality together with the canton.

Governing plan: the municipal land-use plan and the zoning ordinance.

Permanent living is possible inside the building zone where the zone permits residential use and the Baubewilligung is granted. Outside the building zone, living is admissible only in narrowly defined exceptions — the most common reason Swiss projects fail.

Switzerland →
All questions and answers per destination →
Models

Which models come into question.

Eight plans on one technical basis, 2.55 metres wide. What differs is length, layout and specification depth.

ModelLayoutLengthEx works
MD 1Panorama and loft8.00 m or 9.70 m44,900 €
MD 2Two lofts for families9.00 m52,900 €
MD 3Loft plus extra room8.00 m or 9.70 m47,900 €
MD 4Loft, room and veranda8.00 m or 9.00 m50,900 €
MD 5Compact with extra room8.00 m or 9.00 m46,900 €
MD 6Chalet with pitched roof8.00 m or 9.00 m54,900 €
MD 7Entry model8.00 m42,900 €
MD 8Compact, upgraded line8.00 m45,900 €
See MD 1 to MD 8
Checklist

Five points before ordering.

  • A written answer from the responsible authority on admissibility at the specific plot — verbal assurances do not carry a project.
  • Access and unloading point, with photographs and dimensions. In practice the last hundred metres cause more trouble than the long haul.
  • Servicing: the distance to power, drinking water and sewer. That distance sets one of the largest secondary items.
  • Type of use and number of people. Permanent living, holidays and letting lead to different specifications of the same model.
  • Budget range including foundation, connections, unloading, planning, fees and insurance — not just the ex-works price.