Tiny house foundation: screw piles, strip or slab, and how to choose.

The foundation is decided by the ground, not by the house. Get a soil answer before you get a quote, because the three options differ by a factor of five in cost.

Foundation

The foundation is decided by the ground, not by the house. Get a soil answer before you get a quote, because the three options differ by a factor of five in cost.

Screw piles are the default, not the answer

Helical piles are quick, reversible and need no concrete cure, which is why almost every tiny house supplier proposes them first. In firm sand or gravel they are a day's work for a two-person crew and they can be unwound if the house moves on. That reversibility is worth real money when the plot is leased.

They are not universal. In soft clay, peat or made ground the pile has to reach a bearing layer that may be four metres down, and at that depth the price stops being a fraction of a slab. Ask for a probe before you accept the quote, not after the rig arrives.

A strip footing suits a permanent site

Where the house is staying and the ground is uneven, a concrete strip under the two long chassis rails spreads the load and gives a level datum that does not need shimming later. It also raises the timber clear of splash-back, which is the single most common cause of rot at the bottom board.

The cost is groundwork and a cure period, so it lengthens the programme by a fortnight. On a plot where the crane and the excavator are coming anyway, that overlap is cheaper than it looks on paper.

A slab is rarely justified

A full slab is the most expensive option and buys you almost nothing a tiny house needs: it does not improve insulation, because the floor cassette is already insulated, and it removes the ventilated gap beneath the house that keeps the underside dry.

Where it does make sense is a permanent multi-unit site with services routed under the deck, or ground so poor that a raft is the only economical way to spread the load. Both are decisions for an engineer, not a brochure.

Levelling and access decide the day

Whatever the foundation, the house arrives on a lorry and leaves it on a crane. The crane needs firm standing within reach of the final position, and on soft ground that means mats. A foundation that is perfect and unreachable costs a second crane visit.

Set the levels before delivery day and check them with an instrument, not a spirit level across a plank. A house that is 15mm out over eight metres will show at every door.

Frost, drainage and the gap underneath

Every foundation type has to get below the local frost line or be designed to tolerate movement. That depth varies across the five markets and is the first number to ask the local authority for.

Keep the ground under the house draining away and keep the gap ventilated. A skirted, sealed underside traps moisture against the chassis and turns a fifty-year steel frame into a twenty-year one.

Questions

Foundation

The foundation is decided by the ground, not by the house. Get a soil answer before you get a quote, because the three options differ by a factor of five in cost.

Screw piles in firm ground. In soft ground they need depth, and at that point a strip footing is often cheaper. Get a soil probe before comparing quotes.

With screw piles, yes — they unwind. A strip or slab is permanent. If the plot is leased, that reversibility is worth paying for.

For screw piles on known good ground, usually not. For soft, made or sloping ground, yes: the calculation is what keeps the warranty intact.

Five destination markets

What has to be settled in each country.

The same question is answered differently in Copenhagen than in Zurich. These five points belong in every project check, whatever detail you are researching right now.

Germany

Responsible: the lower building authority of the district or independent city.

Governing plan: the Bebauungsplan, or an assessment under §34 or §35 BauGB where there is none.

Permanent living is possible where the plot lies within a built-up area or a Bebauungsplan permits residential use and the project is approved. In the outer area under §35 BauGB, living is privileged only in narrowly defined cases — the most common reason German projects fail.

Germany →

Netherlands

Responsible: the municipality, through the Omgevingsloket.

Governing plan: the municipal omgevingsplan under the Environment and Planning Act.

Permanent living requires a residential function in the omgevingsplan. Many attractive sites are designated for recreation, where permanent residence is not allowed — even where it happens in practice.

Netherlands →

Denmark

Responsible: the kommune.

Governing plan: the lokalplan together with the zone status (byzone, sommerhusområde or landzone).

Permanent living requires a site in byzone or an equivalent designation. In sommerhusområder year-round residence is restricted in principle, and exceptions are tied to personal conditions.

Denmark →

Luxembourg

Responsible: the commune.

Governing plan: the plan d'aménagement général (PAG) and the associated plan d'aménagement particulier (PAP).

Permanent living is possible where the PAG zone permits residential use and the autorisation de construire is granted. Because municipalities are small, practice differs noticeably from place to place.

Luxembourg →

Switzerland

Responsible: the municipality together with the canton.

Governing plan: the municipal land-use plan and the zoning ordinance.

Permanent living is possible inside the building zone where the zone permits residential use and the Baubewilligung is granted. Outside the building zone, living is admissible only in narrowly defined exceptions — the most common reason Swiss projects fail.

Switzerland →
All questions and answers per destination →
Models

Which models come into question.

Eight plans on one technical basis, 2.55 metres wide. What differs is length, layout and specification depth.

ModelLayoutLengthEx works
MD 1Panorama and loft8.00 m or 9.70 m44,900 €
MD 2Two lofts for families9.00 m52,900 €
MD 3Loft plus extra room8.00 m or 9.70 m47,900 €
MD 4Loft, room and veranda8.00 m or 9.00 m50,900 €
MD 5Compact with extra room8.00 m or 9.00 m46,900 €
MD 6Chalet with pitched roof8.00 m or 9.00 m54,900 €
MD 7Entry model8.00 m42,900 €
MD 8Compact, upgraded line8.00 m45,900 €
See MD 1 to MD 8
Checklist

Five points before ordering.

  • A written answer from the responsible authority on admissibility at the specific plot — verbal assurances do not carry a project.
  • Access and unloading point, with photographs and dimensions. In practice the last hundred metres cause more trouble than the long haul.
  • Servicing: the distance to power, drinking water and sewer. That distance sets one of the largest secondary items.
  • Type of use and number of people. Permanent living, holidays and letting lead to different specifications of the same model.
  • Budget range including foundation, connections, unloading, planning, fees and insurance — not just the ex-works price.