Heating

Heating a tiny house: heat pump, wood stove or electric compared.

The right heating depends on the envelope you have already specified. Decide the two together, and decide both before production.

Heating

The right heating depends on the envelope you have already specified. Decide the two together, and decide both before production.

A small heat pump suits a good envelope

In a well-insulated, airtight compact house the heat demand is low enough that the smallest air-to-air units are oversized rather than marginal. That is a good position to be in: the unit modulates down and runs quietly instead of cycling.

It also gives cooling in summer, which in a house with a large glazed elevation is not a luxury. The cost is an outdoor unit that has to be sited where its noise does not fall on the terrace or the neighbour.

A wood stove is independence with obligations

A stove works when nothing else does, and in a small volume a 4 kW unit is usually the smallest available and still too big. It needs a compliant flue, a hearth, a dedicated combustion air supply and somewhere dry to keep a season's wood.

It also needs a person. As a sole heat source for a rental unit it is a liability; as a supplement for an owner who enjoys it, it is the best thing in the house on a February evening.

Electric panels are simple and expensive to run

Direct electric heating has no outdoor unit, no flue, no service interval and the highest running cost per kilowatt-hour delivered. In a house that is occupied three weekends a month, that arithmetic can still come out ahead of a heat pump.

Infrared panels heat surfaces rather than air, which suits intermittent use — the room feels warm faster. For continuous occupation the standing cost dominates and a heat pump wins clearly.

Underfloor or radiators or air

Water-based underfloor in a compact floor cassette adds build-up height and thermal mass that a lightweight building responds to slowly. Air distribution is faster and matches how a small, well-sealed house actually behaves.

If you want the comfort of a warm floor, a small electric mat in the bathroom gives most of the perceived benefit for a fraction of the complication.

Size it on the coldest week, not the average

Heating capacity is chosen against the design outdoor temperature for the site, which differs sharply across the five markets. A unit sized on a Dutch winter is short in a Swiss valley and oversized on a Mediterranean coast.

Give the supplier the destination before the specification is fixed. The insulation, the glazing and the heat source are one decision made three times.

Questions

Heating

The right heating depends on the envelope you have already specified. Decide the two together, and decide both before production.

Usually the smallest unit available is already oversized for a well-insulated compact house. Size against the design temperature for the destination, not a rule of thumb.

For an owner-occupier who is present, yes. For a rental unit, no — it needs a person, dry fuel and a swept flue, and none of those survive an unattended February.

Rarely water-based, in a lightweight compact floor. A small electric mat in the bathroom gives most of the perceived comfort without the build-up height.

Five destination markets

What has to be settled in each country.

The same question is answered differently in Copenhagen than in Zurich. These five points belong in every project check, whatever detail you are researching right now.

Germany

Responsible: the lower building authority of the district or independent city.

Governing plan: the Bebauungsplan, or an assessment under §34 or §35 BauGB where there is none.

Permanent living is possible where the plot lies within a built-up area or a Bebauungsplan permits residential use and the project is approved. In the outer area under §35 BauGB, living is privileged only in narrowly defined cases — the most common reason German projects fail.

Germany →

Netherlands

Responsible: the municipality, through the Omgevingsloket.

Governing plan: the municipal omgevingsplan under the Environment and Planning Act.

Permanent living requires a residential function in the omgevingsplan. Many attractive sites are designated for recreation, where permanent residence is not allowed — even where it happens in practice.

Netherlands →

Denmark

Responsible: the kommune.

Governing plan: the lokalplan together with the zone status (byzone, sommerhusområde or landzone).

Permanent living requires a site in byzone or an equivalent designation. In sommerhusområder year-round residence is restricted in principle, and exceptions are tied to personal conditions.

Denmark →

Luxembourg

Responsible: the commune.

Governing plan: the plan d'aménagement général (PAG) and the associated plan d'aménagement particulier (PAP).

Permanent living is possible where the PAG zone permits residential use and the autorisation de construire is granted. Because municipalities are small, practice differs noticeably from place to place.

Luxembourg →

Switzerland

Responsible: the municipality together with the canton.

Governing plan: the municipal land-use plan and the zoning ordinance.

Permanent living is possible inside the building zone where the zone permits residential use and the Baubewilligung is granted. Outside the building zone, living is admissible only in narrowly defined exceptions — the most common reason Swiss projects fail.

Switzerland →
All questions and answers per destination →
Models

Which models come into question.

Eight plans on one technical basis, 2.55 metres wide. What differs is length, layout and specification depth.

ModelLayoutLengthEx works
MD 1Panorama and loft8.00 m or 9.70 m44,900 €
MD 2Two lofts for families9.00 m52,900 €
MD 3Loft plus extra room8.00 m or 9.70 m47,900 €
MD 4Loft, room and veranda8.00 m or 9.00 m50,900 €
MD 5Compact with extra room8.00 m or 9.00 m46,900 €
MD 6Chalet with pitched roof8.00 m or 9.00 m54,900 €
MD 7Entry model8.00 m42,900 €
MD 8Compact, upgraded line8.00 m45,900 €
See MD 1 to MD 8
Checklist

Five points before ordering.

  • A written answer from the responsible authority on admissibility at the specific plot — verbal assurances do not carry a project.
  • Access and unloading point, with photographs and dimensions. In practice the last hundred metres cause more trouble than the long haul.
  • Servicing: the distance to power, drinking water and sewer. That distance sets one of the largest secondary items.
  • Type of use and number of people. Permanent living, holidays and letting lead to different specifications of the same model.
  • Budget range including foundation, connections, unloading, planning, fees and insurance — not just the ex-works price.

Start your project in two minutes.

Send your country, intended use and preferred model via WhatsApp and we will structure the next step.

WhatsApp enquiry →