Layout and interior

Tiny house layout: making 28 square metres feel like a home, not a compromise.

Small houses fail for two reasons: not enough storage, and nowhere to be alone. Both are layout problems, and both are settled on the plan before anything is built.

In short

Small houses fail for two reasons: not enough storage, and nowhere to be alone. Both are layout problems, and both are settled on the plan before anything is built.

Sightlines do more than square metres

The reason MD 1 reads as the largest house in the range without being the longest is that nothing interrupts the view from one end to the other, and the glazing continues the room into the landscape. Where you cannot add area, you can add distance for the eye to travel. Conversely, a partition placed badly makes a compact plan feel like two cramped ones.

A door is worth more than a corner

The moment two people are home at the same time and one of them is on a call, an open plan stops working. That is the whole argument for MD 3 and MD 5: a room that closes. It does not need to be large — it needs a door. For families, MD 2 solves the same problem differently, with two lofts at opposite ends and the living area between them.

Storage is furniture, not an afterthought

The stair is the largest single storage opportunity in a tiny house, and in our plans it is built as a storage unit rather than as a stair with space wasted underneath. Because the kitchen, bathroom, storage and stair come from our own joinery, dimensions follow the actual plan instead of catalogue modules — which is what makes the difference between storage that fits and storage that nearly fits.

Outside counts as living area if it is covered

A veranda under the continuous roof — the idea MD 4 is built around — extends the living space by several square metres in summer without adding a square metre of heated floor. In a mild, dry location that is the cheapest space in the house. On an exposed or snow-heavy site it is used far less, which is where MD 6 and its pitched roof make more sense.

Questions

Frequently asked, answered here.

MD 1 in the 9.70 metre version: no partitions on the ground floor and full-height glazing, so the area reads considerably larger than it measures.

MD 2, with two lofts at opposite ends and the bathroom and living area between them, so adults and children are not stacked on top of each other.

Kitchen, bathroom, storage and stair come from our own joinery, so dimensions follow the plan. Structural positions and the service wall are fixed before production.

In the flat-roof models the loft is for sleeping. MD 6, with its pitched roof, gives real standing height at the ridge — which is a large part of why it is chosen.

Five destination markets

What has to be settled in each country.

The same question is answered differently in Copenhagen than in Zurich. These five points belong in every project check, whatever detail you are researching right now.

Germany

Responsible: the lower building authority of the district or independent city.

Governing plan: the Bebauungsplan, or an assessment under §34 or §35 BauGB where there is none.

Permanent living is possible where the plot lies within a built-up area or a Bebauungsplan permits residential use and the project is approved. In the outer area under §35 BauGB, living is privileged only in narrowly defined cases — the most common reason German projects fail.

Germany →

Netherlands

Responsible: the municipality, through the Omgevingsloket.

Governing plan: the municipal omgevingsplan under the Environment and Planning Act.

Permanent living requires a residential function in the omgevingsplan. Many attractive sites are designated for recreation, where permanent residence is not allowed — even where it happens in practice.

Netherlands →

Denmark

Responsible: the kommune.

Governing plan: the lokalplan together with the zone status (byzone, sommerhusområde or landzone).

Permanent living requires a site in byzone or an equivalent designation. In sommerhusområder year-round residence is restricted in principle, and exceptions are tied to personal conditions.

Denmark →

Luxembourg

Responsible: the commune.

Governing plan: the plan d'aménagement général (PAG) and the associated plan d'aménagement particulier (PAP).

Permanent living is possible where the PAG zone permits residential use and the autorisation de construire is granted. Because municipalities are small, practice differs noticeably from place to place.

Luxembourg →

Switzerland

Responsible: the municipality together with the canton.

Governing plan: the municipal land-use plan and the zoning ordinance.

Permanent living is possible inside the building zone where the zone permits residential use and the Baubewilligung is granted. Outside the building zone, living is admissible only in narrowly defined exceptions — the most common reason Swiss projects fail.

Switzerland →
All questions and answers per destination →
Models

Which models come into question.

Eight plans on one technical basis, 2.55 metres wide. What differs is length, layout and specification depth.

ModelLayoutLengthEx works
MD 1Panorama and loft8.00 m or 9.70 m44,900 €
MD 2Two lofts for families9.00 m52,900 €
MD 3Loft plus extra room8.00 m or 9.70 m47,900 €
MD 4Loft, room and veranda8.00 m or 9.00 m50,900 €
MD 5Compact with extra room8.00 m or 9.00 m46,900 €
MD 6Chalet with pitched roof8.00 m or 9.00 m54,900 €
MD 7Entry model8.00 m42,900 €
MD 8Compact, upgraded line8.00 m45,900 €
See MD 1 to MD 8
Checklist

Five points before ordering.

  • A written answer from the responsible authority on admissibility at the specific plot — verbal assurances do not carry a project.
  • Access and unloading point, with photographs and dimensions. In practice the last hundred metres cause more trouble than the long haul.
  • Servicing: the distance to power, drinking water and sewer. That distance sets one of the largest secondary items.
  • Type of use and number of people. Permanent living, holidays and letting lead to different specifications of the same model.
  • Budget range including foundation, connections, unloading, planning, fees and insurance — not just the ex-works price.