
Modular buildings for energy projects.
Solar parks, wind farms, grid lines, oil and gas sites: crews and offices for a fixed period, often far from towns, with heat, dust and limited power and water.
The buyer's problem
- Phased mobilisation along a construction programme
- Hot, dusty or coastal sites
- Limited or no grid power and water at the start
- Strict client safety rules
A modular approach
- Accommodation and offices phased with the construction programme
- Shading, insulation and filtration options chosen for the climate
- Off-grid power and water options assessed with specialist partners
- No hazardous-area equipment claimed; such requirements go to qualified specialists
Project inputs we need
- Crew size per phase
- Site climate and exposure
- Available power and water
- Client safety standards
- Duration of use
Buildings for hazardous areas (ATEX or similar) are not offered. Any such requirement must be raised in the brief and addressed by certified specialists.
Relevant building types
Workforce camps
Modular accommodation, sanitation, dining and administration concepts structured around workforce capacity, site access and phased delivery.
MOD-OF · EPC offices, meeting, security, washroomsSite offices and sanitary
Offices, meeting rooms, security cabins and washrooms for a construction or EPC site — relocatable when the project moves on, or specified for permanent use..
MOD-FP · Offices, dormitories, sanitary modulesFlat-pack modular units
Container-type modules shipped as compact packs and assembled on site: offices, dormitories, sanitary and storage units.
From brief to installation
Delivery terms (EXW, FCA, FOB, CIF, DAP or other) are agreed per project and per Incoterms edition in the contract. Nothing on this page fixes a delivery term, a price or a lead time.
- BriefYour programme, site, country, quantities and timeline.
- FeasibilityExport, customs, permits, transport and partner questions for the destination.
- Preliminary layoutModule types, counts and a schematic site arrangement.
- ProposalScope, exclusions, delivery terms and the open points.
- Engineering approvalStructure, building physics and services against the applicable local codes, by qualified engineers.
- ProductionBuilt to MODUNERA's specification once drawings and specification are signed off.
- Quality checksInspection points agreed in the contract.
- ShipmentRoad, Ro-Ro or sea freight to the agreed delivery point.
- InstallationBy MODUNERA's team, a local partner or the client's contractor — as the contract sets out.
Fast answers, clear limits.
No. They are not offered as hazardous-area buildings.
Off-grid power and water are assessed per site with specialist partners. Capacity and approval are project questions.
Quick enquiry — about a minute
Seven fields. A person reads it and replies with the next step; the full project brief can follow.
Our team will review the details and identify the appropriate next technical and commercial discussion. Please keep your reference number for follow-up:
Nothing was saved. Please try again, or write to emre@modunera.com.