A MODUNERA unit — real photograph, not a workforce camps
MODUNERA · MOD-WC · Workforce camps

Workforce accommodation for remote project sites.

Modular accommodation, sanitation, dining and administration concepts structured around workforce capacity, site access and phased delivery. Final technical compliance and production capacity are confirmed for each project.

Project-specific concept — subject to engineering and capacity confirmation
Scope

Project scope, engineering, permissions and delivery are assessed for each destination in Europe and selected African markets. The code MOD-WC is a catalogue reference for enquiries, not a product approval.

Who this is for

Who typically plans this

  • Mining and energy operators housing crews on sites far from towns
  • EPC and main contractors mobilising a project workforce
  • Infrastructure programmes with phased crews over several years

Typical use cases

  • A 100-person exploration or construction camp with rooms, sanitary block, dining and a site office
  • A camp that grows from a first phase to 300 or more beds as the project ramps up
  • A management compound with single rooms, offices and a meeting space inside a larger camp
Technical outline

What is fixed and what is set per project

A row marked MODUNERA reference is a published figure of MODUNERA's units. Every other value is set by engineering for the project and confirmed in the technical offer.

ParameterValueBasis
Building systemFlat-pack, panelised or volumetric, chosen per campSet per project
Unit width2.55 m base width for road-legal volumetric unitsMODUNERA reference
StructureSteel frameMODUNERA reference
Room typesSingle, twin or dormitory rooms, with or without en-suiteSet per project
Insulation and climateSpecified for the site's climate zoneSet per project
Fire safetyTo the applicable local code, verified by a local engineerSet per project
Wind and roof loadsCalculated for the siteSet per project
FoundationsPads, strip or screw piles, by site investigationSet per project
Power, water, wasteGrid, generator or off-grid, assessed per siteSet per project
DeliveryRoad, Ro-Ro or seaMODUNERA reference
Systems

Which building system fits which job

Four ways to deliver a modular building. Which one a project uses depends on transport, site access, the number of units and how permanent the building is meant to be — decided in the feasibility step, not here.

SystemSuitsLimits
Flat-pack modularLarge numbers of identical rooms shipped in compact packs: site offices, dormitories, sanitary units, storageAssembly on site needs a trained crew; finishes are simpler than a volumetric unit; local approval of the system is a project question
Panelised prefabricatedSingle-storey houses and buildings with a freer plan: staff housing, rural and serial housing, schoolsMore site work than volumetric: foundations, panel erection, roofing and finishes on site
Modular volumetricUnits fitted out before they leave the hall: hospitality units, homes, clinics and offices where finish quality mattersTransport size and crane access set the limits; fewer units per truck or container
Mobile tiny house (MD 1–MD 8)Single premium units for private living, holiday rental and small hospitalityA mobile unit and a permanent dwelling or hotel room are different permit categories in most countries
Typical configurations

Three scales, as examples

Every figure here is illustrative. A real configuration follows the site, the permit and the operator's programme.

ScaleCompositionStatus
100 personsAccommodation blocks, one sanitary block, dining and kitchen module, site officeIllustrative
300 personsPhased accommodation, two sanitary blocks, dining, laundry, first-aid room, administration, securityIllustrative
ExpansionFurther accommodation blocks added in later phases on a reserved layoutIllustrative

What we need from you

  • Beds per phase and shift ratio
  • Meals per shift and dining seats
  • Showers, toilets and laundry per bed
  • Office, meeting and first-aid space
  • Site access, nearest port and road conditions
  • Power and water source
Process

From brief to installation

Delivery terms (EXW, FCA, FOB, CIF, DAP or other) are agreed per project and per Incoterms edition in the contract. Nothing on this page fixes a delivery term, a price or a lead time.

  1. BriefYour programme, site, country, quantities and timeline.
  2. FeasibilityExport, customs, permits, transport and partner questions for the destination.
  3. Preliminary layoutModule types, counts and a schematic site arrangement.
  4. ProposalScope, exclusions, delivery terms and the open points.
  5. Engineering approvalStructure, building physics and services against the applicable local codes, by qualified engineers.
  6. ProductionBuilt to MODUNERA's specification once drawings and specification are signed off.
  7. Quality checksInspection points agreed in the contract.
  8. ShipmentRoad, Ro-Ro or sea freight to the agreed delivery point.
  9. InstallationBy MODUNERA's team, a local partner or the client's contractor — as the contract sets out.
Site readiness and permissions

What a site needs before a unit arrives

  • Level platform, drainage and access for trucks and a crane
  • Power, water and wastewater connection or the off-grid plant that replaces them
  • Foundation design from a site investigation
  • Camp operation, catering, security and maintenance arranged by the operator
Country rules

Workforce accommodation rules — room size, occupancy, sanitation ratios, fire separation — differ by country and often by sector. MODUNERA does not describe any camp as compliant before a local engineer has checked it against the code that applies.

Scope and exclusions

Who does what

The same table on every solution page, because the same questions come up in every project.

Scope lineResponsibility
Land procurementby the client unless contracted
Local planning and building permitslocal licensed professionals and authorities
Foundations and site worksscope dependent
Utilities and connectionsscope dependent
Customs, duties and VATdestination and contract dependent
Transport, unloading and craneproject-specific
Installation and warrantycontractual scope dependent
Buyer FAQ

Fast answers, clear limits.

A camp can be planned as accommodation, sanitary, dining and office modules with a site layout. Whether MODUNERA supplies the buildings only or also installation, and what remains with the operator or local contractors, is set in the proposal.

That depends on quantities, specification, production slots and the transport route, and is stated in the proposal. No standard lead time is published.

No certification is claimed. Site-specific requirements — fire, HSE, occupancy — are reviewed with the client's engineers and local professionals for each project.

Quick enquiry — about a minute

Seven fields. A person reads it and replies with the next step; the full project brief can follow.

Your project enquiry has been received.

Our team will review the details and identify the appropriate next technical and commercial discussion. Please keep your reference number for follow-up:

Start your project in two minutes.

Send your country, intended use and preferred model via WhatsApp and we will structure the next step.

WhatsApp enquiry →