Project development

How we work: eight stages, no shortcuts.

A client buys a project, not a product. These are the stages every large project goes through, who takes part in each, and what each one deliberately does not promise.

Discovery and project brief

Country, land, climate, purpose, capacity, number of units, budget band, target date and planning stage.

Who: Client, MODUNERA

No price and no programme yet — the brief decides what can be assessed.

Feasibility and scope review

Local regulations and permits, transport access, foundations and site infrastructure, technical requirements, the need for local consultants.

Who: MODUNERA, local professionals

A feasibility note is not a permit and not a guarantee that a site can be built on.

Concept design and master planning

Site layout, unit types, access routes, shared facilities, repeatable modules — schematic drawings for decisions.

Who: MODUNERA, client, local architect

Concept drawings are not permit drawings.

Engineering and technical specification

Structural, electrical, mechanical, thermal and acoustic performance, fire safety, accessibility, local norms — per discipline.

Who: Engineers of record, MODUNERA technical

Verification is done against the destination's rules by professionals licensed there.

Commercial proposal and contracting

Unit and service breakdown, delivery terms (Incoterms), responsibilities, estimated programme, exclusions, currency and payment stages.

Who: MODUNERA, client

Indicative and binding proposals are labelled as such; nothing unstated is included.

Production and quality gates

Production planning in batches, in-process checks, factory acceptance and reporting as agreed in the contract.

Who: Production, MODUNERA quality

Only the checks the contract names are promised.

International logistics and site preparation

Road, Ro-Ro, sea container or oversized freight; port, customs, crane, foundations, access, utilities ready for the delivery sequence.

Who: Forwarders, customs agents, client's site contractor

Customs, duties and VAT depend on route and contract.

Installation, handover and aftercare

Installation responsibilities, test and handover documents, warranty, maintenance and service scope — local partner and manufacturer roles separated.

Who: Installer, MODUNERA, client

Warranty and service scope are what the contract states for that country.
What this is not

Not an automated process, not a fixed programme and not a guarantee. The stages are the order in which questions get answered; how long each takes depends on the site, the country and the client's own decisions.

Scope and exclusions

Who does what

Scope lineResponsibility
Land procurementby the client unless contracted
Local planning and building permitslocal licensed professionals and authorities
Foundations and site worksscope dependent
Utilities and connectionsscope dependent
Customs, duties and VATdestination and contract dependent
Transport, unloading and craneproject-specific
Installation and warrantycontractual scope dependent
Next step

Your project starts with a clear brief.

Country, intended use, development stage, number of units, target date and approximate budget. That is enough for us to say what the next technical and commercial step is.

Start your project in two minutes.

Send your country, intended use and preferred model via WhatsApp and we will structure the next step.

WhatsApp enquiry →