Purpose-built modular facilities for complex sites.
MODUNERA · Prefabricated facilities

Purpose-built modular facilities for complex sites.

Accommodation, administrative, sanitation and support-building concepts for industrial and institutional developments, structured around practical procurement, access and operational requirements. Each facility type has its own standards; none is presented as a licensed healthcare or education operation.

Base width2,55 m
Unit lengthup to 9,70 m
StructureSteel frame
DeliveryRoad · Ro-Ro · sea
Scope

Project scope, engineering, permissions and delivery are assessed for each destination in Europe and selected African markets.

Who this is for

Who typically plans this

  • Construction and EPC contractors needing worker camps, site offices and sanitary blocks
  • Mining, energy and infrastructure operators with workforce accommodation on remote sites
  • Public buyers and NGOs planning classroom, clinic and administrative buildings
  • Industrial sites adding security, storage and light support structures
Planning and supply

What we can help you plan or supply

  • A facility programme: beds, desks, seats, showers and meals per shift, translated into module counts
  • A campus layout: accommodation blocks, sanitary and dining, administration, circulation, emergency access — schematic
  • A technical submission structure for procurement: drawings, specifications, acceptance criteria, exclusions
  • Climate packages for hot-dry, hot-humid and cold sites, as design axes to be verified
  • Logistics from the hall to the site: road, Ro-Ro, sea container or oversized freight, port, customs, last mile, crane
Typical configurations

Three scales, as examples

Every figure here is illustrative. A real configuration follows the site, the permit and the operator's programme.

ScaleCompositionStatus
100 personsAccommodation blocks, one sanitary block, dining and kitchen module, officeillustrative
300 personsPhased accommodation, two sanitary blocks, dining, first-aid room, administration, securityillustrative
School or clinic buildingClassroom or consultation modules with sanitary and administration — fit-out and licensing by the operatorillustrative
Site readiness and permissions

What a site needs before a unit arrives

  • Site access for container-size or oversized units, unloading area, crane position
  • Power, water, wastewater and fuel supply, or the off-grid assessment that replaces them
  • Ground preparation and foundations for the facility type
  • The procurement model: private project, public tender, EPC subcontract
  • Local standards for fire safety, accessibility, hygiene and occupancy, verified by local professionals

Climate, energy and infrastructure options

  • Hot-dry: solar gain, shading, thermal performance, dust filtration, passive ventilation
  • Hot-humid: ventilation, condensation, corrosion, coating durability, rainwater management
  • Cold and alpine: insulation, heating, snow load verification
  • Storm, seismic and flood exposure: local engineering analysis, always
Scope and exclusions

Who does what

The same table on every solution page, because the same questions come up in every project.

Scope lineResponsibility
Land procurementby the client unless contracted
Local planning and building permitslocal licensed professionals and authorities
Foundations and site worksscope dependent
Utilities and connectionsscope dependent
Customs, duties and VATdestination and contract dependent
Transport, unloading and craneproject-specific
Installation and warrantycontractual scope dependent
Buyer FAQ

Fast answers, clear limits.

The building — consultation rooms, sanitary, waiting and administration modules — as a facility building. Medical equipment, licensing and the healthcare operation are the operator's, and the page says so.

No. Container-type modular units are built as units; a converted shipping container is a different product. Where a project needs ISO-container dimensions for sea freight, the unit is designed to them.

With a technical submission structure: drawings, specification, acceptance criteria and exclusions in the format the tender asks for. Whether MODUNERA bids directly or supplies a bidder is decided per procurement model.

Only with verified capacity and tender terms for the specific case. It is listed as a facility type, not as a standing capability.

Next step

Request a facility proposal.

Country, intended use, development stage, number of units, target date and approximate budget. That is enough for us to say what the next technical and commercial step is.

Start your project in two minutes.

Send your country, intended use and preferred model via WhatsApp and we will structure the next step.

WhatsApp enquiry →