A MODUNERA unit — real photograph, not a site offices and sanitary
MODUNERA · MOD-OF · Site offices and sanitary

Site offices and sanitary blocks that move with the project.

Offices, meeting rooms, security cabins and washrooms for a construction or EPC site — relocatable when the project moves on, or specified for permanent use.

Project-specific concept — subject to engineering and capacity confirmation
Scope

Project scope, engineering, permissions and delivery are assessed for each destination in Europe and selected African markets. The code MOD-OF is a catalogue reference for enquiries, not a product approval.

Who this is for

Who typically plans this

  • EPC contractors and their client representatives
  • Construction companies with several sites
  • Industrial sites needing security and control buildings

Typical use cases

  • A project management office for 20 to 40 staff with meeting rooms
  • A sanitary block for a site workforce
  • A gatehouse with security and control room
Technical outline

What is fixed and what is set per project

A row marked MODUNERA reference is a published figure of MODUNERA's units. Every other value is set by engineering for the project and confirmed in the technical offer.

ParameterValueBasis
Building systemFlat-pack or volumetricSet per project
StructureSteel frameMODUNERA reference
InteriorOffice, meeting, kitchenette, toilets — to the briefSet per project
ClimateInsulation, shading and air-conditioning provision per siteSet per project
IT and electricalCable routes and boards to the client's standardSet per project
RelocationDesign for dismantling and reuse, where requestedSet per project
Systems

Which building system fits which job

Four ways to deliver a modular building. Which one a project uses depends on transport, site access, the number of units and how permanent the building is meant to be — decided in the feasibility step, not here.

SystemSuitsLimits
Flat-pack modularLarge numbers of identical rooms shipped in compact packs: site offices, dormitories, sanitary units, storageAssembly on site needs a trained crew; finishes are simpler than a volumetric unit; local approval of the system is a project question
Panelised prefabricatedSingle-storey houses and buildings with a freer plan: staff housing, rural and serial housing, schoolsMore site work than volumetric: foundations, panel erection, roofing and finishes on site
Modular volumetricUnits fitted out before they leave the hall: hospitality units, homes, clinics and offices where finish quality mattersTransport size and crane access set the limits; fewer units per truck or container
Mobile tiny house (MD 1–MD 8)Single premium units for private living, holiday rental and small hospitalityA mobile unit and a permanent dwelling or hotel room are different permit categories in most countries
Typical configurations

Three scales, as examples

Every figure here is illustrative. A real configuration follows the site, the permit and the operator's programme.

ScaleCompositionStatus
Small officeTwo office modules, meeting module, toiletIllustrative
Project officeOpen office, private offices, meeting rooms, sanitary, kitchenetteIllustrative
GatehouseSecurity cabin, control room, toiletIllustrative

What we need from you

  • Staff numbers and room list
  • Temporary or permanent
  • Relocations expected
  • Site location and access
  • Client's HSE and IT standards
Process

From brief to installation

Delivery terms (EXW, FCA, FOB, CIF, DAP or other) are agreed per project and per Incoterms edition in the contract. Nothing on this page fixes a delivery term, a price or a lead time.

  1. BriefYour programme, site, country, quantities and timeline.
  2. FeasibilityExport, customs, permits, transport and partner questions for the destination.
  3. Preliminary layoutModule types, counts and a schematic site arrangement.
  4. ProposalScope, exclusions, delivery terms and the open points.
  5. Engineering approvalStructure, building physics and services against the applicable local codes, by qualified engineers.
  6. ProductionBuilt to MODUNERA's specification once drawings and specification are signed off.
  7. Quality checksInspection points agreed in the contract.
  8. ShipmentRoad, Ro-Ro or sea freight to the agreed delivery point.
  9. InstallationBy MODUNERA's team, a local partner or the client's contractor — as the contract sets out.
Site readiness and permissions

What a site needs before a unit arrives

  • Pads or foundations
  • Power and data connection
  • Water and drainage for sanitary modules
Country rules

Permanent offices need a building permit in most countries; temporary site buildings may follow a simpler route. The contractor's local team confirms which applies.

Scope and exclusions

Who does what

The same table on every solution page, because the same questions come up in every project.

Scope lineResponsibility
Land procurementby the client unless contracted
Local planning and building permitslocal licensed professionals and authorities
Foundations and site worksscope dependent
Utilities and connectionsscope dependent
Customs, duties and VATdestination and contract dependent
Transport, unloading and craneproject-specific
Installation and warrantycontractual scope dependent
Buyer FAQ

Fast answers, clear limits.

If relocation is in the brief, the units can be designed for it. How often and how far is part of the specification.

Client standards for HSE, IT and branding are taken into the specification where the system allows.

Quick enquiry — about a minute

Seven fields. A person reads it and replies with the next step; the full project brief can follow.

Your project enquiry has been received.

Our team will review the details and identify the appropriate next technical and commercial discussion. Please keep your reference number for follow-up:

Start your project in two minutes.

Send your country, intended use and preferred model via WhatsApp and we will structure the next step.

WhatsApp enquiry →