
Modular camps and buildings for mining projects.
Remote sites need beds, meals, washrooms and offices before the first ore is moved. MODUNERA plans these as modules that travel well and can grow with the project.
The buyer's problem
- Crews arrive before permanent infrastructure exists
- Long and uncertain transport routes to the site
- Bed numbers that change between exploration, construction and operation
- Heat, dust, rain or cold that wear standard buildings quickly
A modular approach
- A camp layout in phases, with space reserved for growth
- Module types chosen for the transport route — flat-pack where volume matters, volumetric where finish matters
- Climate options specified for the site and checked by engineers
- Clear split between what MODUNERA supplies and what the operator or local contractors do
Project inputs we need
- Beds per phase and shift ratio
- Dining, laundry and recreation needs
- Site location, road and nearest port
- Power and water source
- HSE requirements of the operator
No camp is described as compliant with mining, HSE or occupancy rules until the operator's engineers and local professionals have checked it.
Relevant building types
Workforce camps
Modular accommodation, sanitation, dining and administration concepts structured around workforce capacity, site access and phased delivery.
MOD-FP · Offices, dormitories, sanitary modulesFlat-pack modular units
Container-type modules shipped as compact packs and assembled on site: offices, dormitories, sanitary and storage units.
MOD-OF · EPC offices, meeting, security, washroomsSite offices and sanitary
Offices, meeting rooms, security cabins and washrooms for a construction or EPC site — relocatable when the project moves on, or specified for permanent use..
MOD-HC · Clinic buildings — not the medical operationHealthcare buildings
Consultation rooms, first-aid stations and clinic buildings in modular form.
From brief to installation
Delivery terms (EXW, FCA, FOB, CIF, DAP or other) are agreed per project and per Incoterms edition in the contract. Nothing on this page fixes a delivery term, a price or a lead time.
- BriefYour programme, site, country, quantities and timeline.
- FeasibilityExport, customs, permits, transport and partner questions for the destination.
- Preliminary layoutModule types, counts and a schematic site arrangement.
- ProposalScope, exclusions, delivery terms and the open points.
- Engineering approvalStructure, building physics and services against the applicable local codes, by qualified engineers.
- ProductionBuilt to MODUNERA's specification once drawings and specification are signed off.
- Quality checksInspection points agreed in the contract.
- ShipmentRoad, Ro-Ro or sea freight to the agreed delivery point.
- InstallationBy MODUNERA's team, a local partner or the client's contractor — as the contract sets out.
Fast answers, clear limits.
There is no completed MODUNERA mining camp to show. The pages describe a planning approach and module types, labelled as concepts.
If relocation is in the brief, modules can be specified for dismantling and reuse.
Quick enquiry — about a minute
Seven fields. A person reads it and replies with the next step; the full project brief can follow.
Our team will review the details and identify the appropriate next technical and commercial discussion. Please keep your reference number for follow-up:
Nothing was saved. Please try again, or write to emre@modunera.com.