
Flat-pack modular units for sites that need many rooms quickly.
Container-type modules shipped as compact packs and assembled on site: offices, dormitories, sanitary and storage units. A useful system where many identical rooms have to travel a long way.
Project scope, engineering, permissions and delivery are assessed for each destination in Europe and selected African markets. The code MOD-FP is a catalogue reference for enquiries, not a product approval.
Who typically plans this
- Contractors setting up a site compound
- Operators needing extra rooms on an existing site
- Distributors serving construction clients in their country
Typical use cases
- A site office compound with meeting room, toilets and storage
- Dormitory and sanitary modules for a project crew
- Guard houses and storage units
What is fixed and what is set per project
A row marked MODUNERA reference is a published figure of MODUNERA's units. Every other value is set by engineering for the project and confirmed in the technical offer.
| Parameter | Value | Basis |
|---|---|---|
| Module type | Flat-pack, container-type | Set per project |
| Module dimensions | Confirmed in the technical offer | Set per project |
| Structure | Steel frame | MODUNERA reference |
| Wall and roof panels | Panel type and thickness specified per climate | Set per project |
| Fire performance | Not claimed; specified and verified per project | Set per project |
| Electrical and plumbing | To the destination's standards | Set per project |
| Packing | Packs per container or truck confirmed in the offer | Set per project |
Which building system fits which job
Four ways to deliver a modular building. Which one a project uses depends on transport, site access, the number of units and how permanent the building is meant to be — decided in the feasibility step, not here.
| System | Suits | Limits |
|---|---|---|
| Flat-pack modular | Large numbers of identical rooms shipped in compact packs: site offices, dormitories, sanitary units, storage | Assembly on site needs a trained crew; finishes are simpler than a volumetric unit; local approval of the system is a project question |
| Panelised prefabricated | Single-storey houses and buildings with a freer plan: staff housing, rural and serial housing, schools | More site work than volumetric: foundations, panel erection, roofing and finishes on site |
| Modular volumetric | Units fitted out before they leave the hall: hospitality units, homes, clinics and offices where finish quality matters | Transport size and crane access set the limits; fewer units per truck or container |
| Mobile tiny house (MD 1–MD 8) | Single premium units for private living, holiday rental and small hospitality | A mobile unit and a permanent dwelling or hotel room are different permit categories in most countries |
Three scales, as examples
Every figure here is illustrative. A real configuration follows the site, the permit and the operator's programme.
| Scale | Composition | Status |
|---|---|---|
| Site office | Office modules, meeting module, sanitary module | Illustrative |
| Dormitory block | Rooms, corridor modules, sanitary module | Illustrative |
| Sanitary block | Toilets, showers, washbasins, laundry | Illustrative |
What we need from you
- Number and type of modules
- Interior layout of each type
- Climate and site location
- Who assembles on site
- Nearest port and road access
From brief to installation
Delivery terms (EXW, FCA, FOB, CIF, DAP or other) are agreed per project and per Incoterms edition in the contract. Nothing on this page fixes a delivery term, a price or a lead time.
- BriefYour programme, site, country, quantities and timeline.
- FeasibilityExport, customs, permits, transport and partner questions for the destination.
- Preliminary layoutModule types, counts and a schematic site arrangement.
- ProposalScope, exclusions, delivery terms and the open points.
- Engineering approvalStructure, building physics and services against the applicable local codes, by qualified engineers.
- ProductionBuilt to MODUNERA's specification once drawings and specification are signed off.
- Quality checksInspection points agreed in the contract.
- ShipmentRoad, Ro-Ro or sea freight to the agreed delivery point.
- InstallationBy MODUNERA's team, a local partner or the client's contractor — as the contract sets out.
What a site needs before a unit arrives
- Level foundations or pads
- A trained assembly crew — MODUNERA supervision, local partner or client crew, as agreed
- Power, water and drainage points
Temporary site buildings are often regulated differently from permanent ones. The intended duration of use belongs in the brief.
Who does what
The same table on every solution page, because the same questions come up in every project.
| Scope line | Responsibility |
|---|---|
| Land procurement | by the client unless contracted |
| Local planning and building permits | local licensed professionals and authorities |
| Foundations and site works | scope dependent |
| Utilities and connections | scope dependent |
| Customs, duties and VAT | destination and contract dependent |
| Transport, unloading and crane | project-specific |
| Installation and warranty | contractual scope dependent |
No datasheet is published for this family yet; technical information is supplied with the offer.
Fast answers, clear limits.
Dimensions are confirmed in the technical offer for the system chosen. They are not published as a standard here.
That is possible with instructions and, where agreed, supervision. Who assembles and who is liable for assembly is set in the contract.
There is no published datasheet yet. Technical information is supplied with the offer.
Quick enquiry — about a minute
Seven fields. A person reads it and replies with the next step; the full project brief can follow.
Our team will review the details and identify the appropriate next technical and commercial discussion. Please keep your reference number for follow-up:
Nothing was saved. Please try again, or write to emre@modunera.com.
Industries and other building types
Construction and EPC
Site compounds, offices, crew housing
Mining and remote camps
Accommodation and facilities for remote sites
Oil, gas and energy
Phased mobilisation in harsh climates
Prefabricated facilities
MOD-WC · Accommodation for remote project sitesWorkforce camps
Modular accommodation, sanitation, dining and administration concepts structured around workforce capacity, site access and phased delivery.
MOD-PH · Serial single-storey homes for developersPrefabricated houses
Single-storey homes in series — staff housing, rural housing, a first phase of a community — planned around plot sizes, local building rules and the logistics to the site..
MOD-OF · EPC offices, meeting, security, washroomsSite offices and sanitary
Offices, meeting rooms, security cabins and washrooms for a construction or EPC site — relocatable when the project moves on, or specified for permanent use..
MOD-ED · Classroom buildings — the building, not the schoolModular schools
Classroom, sanitary and staff modules arranged as a school building.
MOD-HC · Clinic buildings — not the medical operationHealthcare buildings
Consultation rooms, first-aid stations and clinic buildings in modular form.