Acoustics

Tiny house acoustics: rain on the roof, footsteps on the loft, and the neighbour.

Nobody asks about sound before they order and almost everybody mentions it afterwards. Three of the four problems are solved on the drawing.

Acoustics

Nobody asks about sound before they order and almost everybody mentions it afterwards. Three of the four problems are solved on the drawing.

Rain on a metal roof is the classic complaint

A standing-seam roof directly over an insulated deck drums. The fix is mass and decoupling: a heavier deck board, a resilient layer under the seam and a fully filled cavity. Done at production it costs little; done afterwards it means stripping the roof.

If the house is a holiday let, weight this heavily. A guest who cannot sleep through rain writes the review that sets next season's price.

Footsteps on the loft carry straight down

A lightweight loft deck transmits impact sound into the living space beneath it — the one place where somebody else is sitting. A resilient layer under the finish floor and a filled void between the joists cuts most of it.

This is the cheapest acoustic upgrade in the house and the one most often left out because it is invisible on a specification.

An internal partition has to have mass

A stud wall with a board each side and nothing between separates the view and nothing else. Filling the cavity and using two layers on one side takes a partition from useless to genuinely private, and costs a few centimetres of plan.

If the point of the room is that someone can take a call in it, say so before production. The wall gets built once.

Appliances are the background you live in

In an open plan the extractor hood, the ventilation unit, the fridge and the dishwasher run in the same room as the sofa. Specify each by its rated noise, not by its brand: below 50 dB for the hood, below 45 dB for the dishwasher, and a ventilation unit whose spec sheet gives sound power, not just airflow.

Site the MVHR unit away from the sleeping area and on resilient mounts. It runs continuously, which is exactly why it must be inaudible.

Soft surfaces do the rest

A compact interior with hard floors, glass and plaster is reverberant, and reverberation is what makes a small room feel busy. A rug, curtains and an upholstered seat drop the reverberation time enough to be obvious.

This is the one acoustic fix you can make after handover, and it is worth doing before concluding that the building is at fault.

Questions

Acoustics

Nobody asks about sound before they order and almost everybody mentions it afterwards. Three of the four problems are solved on the drawing.

On a bare standing-seam roof, yes. Mass and a resilient layer under the seam fix it at production; afterwards it means stripping the roof covering.

Partly, with a rug and soft furnishing. The resilient layer under the finish floor has to go in during the build.

Under 50 dB for the extractor and under 45 dB for the dishwasher. In an open plan they run in the same room as the sofa.

Five destination markets

What has to be settled in each country.

The same question is answered differently in Copenhagen than in Zurich. These five points belong in every project check, whatever detail you are researching right now.

Germany

Responsible: the lower building authority of the district or independent city.

Governing plan: the Bebauungsplan, or an assessment under §34 or §35 BauGB where there is none.

Permanent living is possible where the plot lies within a built-up area or a Bebauungsplan permits residential use and the project is approved. In the outer area under §35 BauGB, living is privileged only in narrowly defined cases — the most common reason German projects fail.

Germany →

Netherlands

Responsible: the municipality, through the Omgevingsloket.

Governing plan: the municipal omgevingsplan under the Environment and Planning Act.

Permanent living requires a residential function in the omgevingsplan. Many attractive sites are designated for recreation, where permanent residence is not allowed — even where it happens in practice.

Netherlands →

Denmark

Responsible: the kommune.

Governing plan: the lokalplan together with the zone status (byzone, sommerhusområde or landzone).

Permanent living requires a site in byzone or an equivalent designation. In sommerhusområder year-round residence is restricted in principle, and exceptions are tied to personal conditions.

Denmark →

Luxembourg

Responsible: the commune.

Governing plan: the plan d'aménagement général (PAG) and the associated plan d'aménagement particulier (PAP).

Permanent living is possible where the PAG zone permits residential use and the autorisation de construire is granted. Because municipalities are small, practice differs noticeably from place to place.

Luxembourg →

Switzerland

Responsible: the municipality together with the canton.

Governing plan: the municipal land-use plan and the zoning ordinance.

Permanent living is possible inside the building zone where the zone permits residential use and the Baubewilligung is granted. Outside the building zone, living is admissible only in narrowly defined exceptions — the most common reason Swiss projects fail.

Switzerland →
All questions and answers per destination →
Models

Which models come into question.

Eight plans on one technical basis, 2.55 metres wide. What differs is length, layout and specification depth.

ModelLayoutLengthEx works
MD 1Panorama and loft8.00 m or 9.70 m44,900 €
MD 2Two lofts for families9.00 m52,900 €
MD 3Loft plus extra room8.00 m or 9.70 m47,900 €
MD 4Loft, room and veranda8.00 m or 9.00 m50,900 €
MD 5Compact with extra room8.00 m or 9.00 m46,900 €
MD 6Chalet with pitched roof8.00 m or 9.00 m54,900 €
MD 7Entry model8.00 m42,900 €
MD 8Compact, upgraded line8.00 m45,900 €
See MD 1 to MD 8
Checklist

Five points before ordering.

  • A written answer from the responsible authority on admissibility at the specific plot — verbal assurances do not carry a project.
  • Access and unloading point, with photographs and dimensions. In practice the last hundred metres cause more trouble than the long haul.
  • Servicing: the distance to power, drinking water and sewer. That distance sets one of the largest secondary items.
  • Type of use and number of people. Permanent living, holidays and letting lead to different specifications of the same model.
  • Budget range including foundation, connections, unloading, planning, fees and insurance — not just the ex-works price.