Tiny house connections: electricity, water and wastewater on site

Grid connection, partial autonomy or off-grid – how to plan the supply of a tiny house in the target markets and where the costs arise.

Short answer

Supply is rarely part of the house price and almost always the most variable item. Grid connection, partial autonomy and off-grid are three routes with very different cost profiles.

1. Three routes, three cost profiles

A grid connection is simplest in operation but costs considerably depending on the distance to the line. Partial autonomy – grid power plus solar and storage – lowers running costs at moderate investment. Off-grid moves everything into equipment.

Which route works is decided by location: a plot 150 metres from the nearest line calculates differently from one on the street.

2. Electricity

The service connection is applied for with the local network operator. Costs depend on distance, routing and connected load. Solar with storage can reduce consumption but rarely replaces the connection entirely in winter.

With a heat pump or direct heating the required connected load rises, which belongs in the same application.

3. Water

A connection to the public network is the normal case. Alternatively, fresh water tanks with refilling create autonomy but generate operating effort.

In frost regions – Denmark, Swiss altitudes – frost-safe routing and trace heating belong in the design rather than in retrofitting.

4. Wastewater

Sewer connection, collection tank or small treatment plant – admissibility follows municipal rules and water protection. In the Netherlands the water authority is additionally involved through the Environment and Planning Portal.

Separating dry toilets reduce black water but do not solve the grey water question from kitchen and shower.

5. The order of applications

Approach network operator, water utility and municipality in parallel before the delivery date is fixed. These lead times are the most common reason a delivered house is not yet habitable.

Official sources

FAQ

No. Connections are contracted locally and are not part of the ex-works price. MODUNERA supplies the technical requirements and connection points.

Technically yes, with solar, storage, a water tank and a wastewater solution. Economically it depends on how expensive a grid connection would be at that specific site.

It is heavily distance-dependent and calculated by the local network operator. A blanket figure would be misleading.

With frost-safe routing, sufficient insulation and suitable heating, yes. In frost regions that belongs in the initial design.

Five destination markets

What has to be settled in each country.

The same question is answered differently in Copenhagen than in Zurich. These five points belong in every project check, whatever detail you are researching right now.

Germany

Responsible: the lower building authority of the district or independent city.

Governing plan: the Bebauungsplan, or an assessment under §34 or §35 BauGB where there is none.

Permanent living is possible where the plot lies within a built-up area or a Bebauungsplan permits residential use and the project is approved. In the outer area under §35 BauGB, living is privileged only in narrowly defined cases — the most common reason German projects fail.

Germany →

Netherlands

Responsible: the municipality, through the Omgevingsloket.

Governing plan: the municipal omgevingsplan under the Environment and Planning Act.

Permanent living requires a residential function in the omgevingsplan. Many attractive sites are designated for recreation, where permanent residence is not allowed — even where it happens in practice.

Netherlands →

Denmark

Responsible: the kommune.

Governing plan: the lokalplan together with the zone status (byzone, sommerhusområde or landzone).

Permanent living requires a site in byzone or an equivalent designation. In sommerhusområder year-round residence is restricted in principle, and exceptions are tied to personal conditions.

Denmark →

Luxembourg

Responsible: the commune.

Governing plan: the plan d'aménagement général (PAG) and the associated plan d'aménagement particulier (PAP).

Permanent living is possible where the PAG zone permits residential use and the autorisation de construire is granted. Because municipalities are small, practice differs noticeably from place to place.

Luxembourg →

Switzerland

Responsible: the municipality together with the canton.

Governing plan: the municipal land-use plan and the zoning ordinance.

Permanent living is possible inside the building zone where the zone permits residential use and the Baubewilligung is granted. Outside the building zone, living is admissible only in narrowly defined exceptions — the most common reason Swiss projects fail.

Switzerland →
All questions and answers per destination →
Models

Which models come into question.

Eight plans on one technical basis, 2.55 metres wide. What differs is length, layout and specification depth.

ModelLayoutLengthEx works
MD 1Panorama and loft8.00 m or 9.70 m44,900 €
MD 2Two lofts for families9.00 m52,900 €
MD 3Loft plus extra room8.00 m or 9.70 m47,900 €
MD 4Loft, room and veranda8.00 m or 9.00 m50,900 €
MD 5Compact with extra room8.00 m or 9.00 m46,900 €
MD 6Chalet with pitched roof8.00 m or 9.00 m54,900 €
MD 7Entry model8.00 m42,900 €
MD 8Compact, upgraded line8.00 m45,900 €
See MD 1 to MD 8
Checklist

Five points before ordering.

  • A written answer from the responsible authority on admissibility at the specific plot — verbal assurances do not carry a project.
  • Access and unloading point, with photographs and dimensions. In practice the last hundred metres cause more trouble than the long haul.
  • Servicing: the distance to power, drinking water and sewer. That distance sets one of the largest secondary items.
  • Type of use and number of people. Permanent living, holidays and letting lead to different specifications of the same model.
  • Budget range including foundation, connections, unloading, planning, fees and insurance — not just the ex-works price.