Planning study

Industrial workforce campus

A workforce campus for a remote energy or infrastructure site, built in two phases from 100 to 300 persons: accommodation blocks of four modules, a sanitary block per 50 persons, a dining hall with kitchen, an administration module, a first-aid room (the room, not a licensed clinic) and a security module at the gate. Emergency vehicles reach every block from the ring road.

Concept — not built 100–300 persons, phased · every figure illustrative, to be validated against a real site
Layout idea

How the modules sit on the site

Schematic concept diagram, drawn to count modules and show a layout idea: accommodation blocks on a ring road, dining and administration at the entrance, sanitary blocks between the rows (54 unit positions shown). Not a site plan, not a render, not a built project.
Module mix

What the concept is made of

ModuleCountNote
Accommodation block (4 modules, 16 beds)19phase 1: 7, phase 2: 12
Sanitary block6one per 50 persons
Dining hall and kitchen1triple module
Administration1double module
First-aid room1single module
Security and gate1single module

Phasing

Phase 1 (100 persons) ships as sea-freight-sized units with the dining and administration modules; phase 2 adds twelve accommodation blocks and two sanitary blocks on the prepared ring.

Scope limits

What this study does not settle

  • Climate package (hot-dry, hot-humid, cold) and off-grid power, water and wastewater are design axes to be engineered per site
  • Logistics shown as hall → port → customs → site; routes, duties and local assembly partners are project-specific
  • Person counts, module counts and programme are illustrative; fire, hygiene and occupancy standards are the destination's
Scope lineResponsibility
Land procurementby the client unless contracted
Local planning and building permitslocal licensed professionals and authorities
Foundations and site worksscope dependent
Utilities and connectionsscope dependent
Customs, duties and VATdestination and contract dependent
Transport, unloading and craneproject-specific
Installation and warrantycontractual scope dependent
Photograph

A real unit, for scale

The photograph shows a MODUNERA unit in production or delivered — the module the concept counts in. It is not an image of the concept.

A MODUNERA unit — photograph, not the Industrial workforce campus concept
A MODUNERA unit — photograph, not the Industrial workforce campus concept
Next step

Planning something like the industrial workforce campus?

Country, intended use, development stage, number of units, target date and approximate budget. That is enough for us to say what the next technical and commercial step is.