Home office

Working from a tiny house: the desk, the light and the connection.

A laptop on the dining table works for a week. After that you want a surface that stays put, a chair that is honest, and a background you are willing to be seen against.

Home office

A laptop on the dining table works for a week. After that you want a surface that stays put, a chair that is honest, and a background you are willing to be seen against.

A fixed desk needs 1.2 by 0.6 metres

That is enough for a monitor, a keyboard and a notebook, and it is the point below which the desk becomes a laptop shelf. Plan it as a permanent piece of the layout rather than an item of furniture, and it takes almost nothing from the living space.

A wall-hung top with a cable tray underneath keeps the floor clear and lets a proper chair tuck away. That chair matters more than any other purchase in the house if you sit in it forty hours a week.

Light from the side, never from behind the screen

A desk facing a window puts glare on the display; a desk backing onto one puts the window behind your head on every call and turns you into a silhouette. Side light solves both, and a rooflight above solves it better.

Add a task lamp with a warm output for winter afternoons. The overhead light that suits cooking is not the light that suits a screen.

Connectivity is a site question, not a house question

Check the fixed-line and mobile coverage at the plot before you commit, not at the nearest village. A rural plot with one bar of 4G will not carry a working day of video calls, and no amount of specification inside the house changes that.

Where fibre is not available, a fixed external antenna and a router with an external SIM usually beats a phone hotspot by a wide margin. Route a conduit for the antenna cable at production.

A door is what makes it work for two people

One open volume is fine until one person is on a call and the other is not. MD 3's closable ground-floor room is the model that suits a household where somebody works from home most days, and the partition needs mass, not just a leaf.

Where a door is impossible, a level change and a screen give some of the same benefit. It is a poorer answer, but it is a real one.

Sockets and network at desk height

Power at worktop height, a network outlet beside it and enough sockets for a monitor, a laptop, a lamp and a charger. All of that is a drawing note before production and a trailing extension lead afterwards.

Add one socket you think you will not need. It is the one you use.

Questions

Home office

A laptop on the dining table works for a week. After that you want a surface that stays put, a chair that is honest, and a background you are willing to be seen against.

About 1.2 by 0.6 metres of fixed desk with room for a proper chair. Below that it becomes a laptop shelf rather than a workplace.

MD 3, for its closable ground-floor room. Where the whole plan is open, one person on a call occupies the entire house.

Check coverage at the plot itself before committing. Where fibre is absent, an external antenna and a router with a SIM beats a phone hotspot — run the conduit at production.

Five destination markets

What has to be settled in each country.

The same question is answered differently in Copenhagen than in Zurich. These five points belong in every project check, whatever detail you are researching right now.

Germany

Responsible: the lower building authority of the district or independent city.

Governing plan: the Bebauungsplan, or an assessment under §34 or §35 BauGB where there is none.

Permanent living is possible where the plot lies within a built-up area or a Bebauungsplan permits residential use and the project is approved. In the outer area under §35 BauGB, living is privileged only in narrowly defined cases — the most common reason German projects fail.

Germany →

Netherlands

Responsible: the municipality, through the Omgevingsloket.

Governing plan: the municipal omgevingsplan under the Environment and Planning Act.

Permanent living requires a residential function in the omgevingsplan. Many attractive sites are designated for recreation, where permanent residence is not allowed — even where it happens in practice.

Netherlands →

Denmark

Responsible: the kommune.

Governing plan: the lokalplan together with the zone status (byzone, sommerhusområde or landzone).

Permanent living requires a site in byzone or an equivalent designation. In sommerhusområder year-round residence is restricted in principle, and exceptions are tied to personal conditions.

Denmark →

Luxembourg

Responsible: the commune.

Governing plan: the plan d'aménagement général (PAG) and the associated plan d'aménagement particulier (PAP).

Permanent living is possible where the PAG zone permits residential use and the autorisation de construire is granted. Because municipalities are small, practice differs noticeably from place to place.

Luxembourg →

Switzerland

Responsible: the municipality together with the canton.

Governing plan: the municipal land-use plan and the zoning ordinance.

Permanent living is possible inside the building zone where the zone permits residential use and the Baubewilligung is granted. Outside the building zone, living is admissible only in narrowly defined exceptions — the most common reason Swiss projects fail.

Switzerland →
All questions and answers per destination →
Models

Which models come into question.

Eight plans on one technical basis, 2.55 metres wide. What differs is length, layout and specification depth.

ModelLayoutLengthEx works
MD 1Panorama and loft8.00 m or 9.70 m44,900 €
MD 2Two lofts for families9.00 m52,900 €
MD 3Loft plus extra room8.00 m or 9.70 m47,900 €
MD 4Loft, room and veranda8.00 m or 9.00 m50,900 €
MD 5Compact with extra room8.00 m or 9.00 m46,900 €
MD 6Chalet with pitched roof8.00 m or 9.00 m54,900 €
MD 7Entry model8.00 m42,900 €
MD 8Compact, upgraded line8.00 m45,900 €
See MD 1 to MD 8
Checklist

Five points before ordering.

  • A written answer from the responsible authority on admissibility at the specific plot — verbal assurances do not carry a project.
  • Access and unloading point, with photographs and dimensions. In practice the last hundred metres cause more trouble than the long haul.
  • Servicing: the distance to power, drinking water and sewer. That distance sets one of the largest secondary items.
  • Type of use and number of people. Permanent living, holidays and letting lead to different specifications of the same model.
  • Budget range including foundation, connections, unloading, planning, fees and insurance — not just the ex-works price.

Start your project in two minutes.

Send your country, intended use and preferred model via WhatsApp and we will structure the next step.

WhatsApp enquiry →